Skip to docs navigation

05.03 Mold Making Multiples Installed Assignment

Assignment Deliverables

  1. Complete, considered, polished, and finished installation of multiple cast objects

Assignment Overview

Research images of existing installations of multiple objects. Look at images of grocery store aisles, clothing stores, car lots, trash dumps, etc. Think about what enhances the display of multiple objects. You can emphasize the multiple of play it down. Your decisions should be intentional.

Fabricate any needed display structures such as shelves, hanging devices, support structures.

Your installation should be complete and installed before the start of class. You can install the night before in SEM 212B and SEM 212C the installation rooms.

Grading Rubric

AssessmentWeight
Multiple Casts Displayed40 points
Installation Structure Use and Consideration40 points
Intentionality of Placement and Lighting40 points
Overall Refinement / Quality of Installation40 points